MRO & AftermarketClearance sheet
Duncan Aviation adds dedicated project managers to Honeywell and P&WC engine overhaul lines
Duncan Aviation names James Rosenkranz and Janet Beazley as project managers for its Honeywell TFE731 and Pratt & Whitney Canada PW300/PW500 engine overhaul programs, promising operators a single point of contact.
Read-back
- Duncan Aviation appointed James Rosenkranz as project manager for Honeywell Aerospace TFE731 engine overhauls.
- Janet Beazley, with Duncan Aviation since 1988 and 18 years as a project manager, now manages the PW300/PW500 DOF line.
- Rosenkranz has worked in the Engine Line Shop, TFE731 Overhaul Shop and Quality department since joining in 2016.
- Pratt & Whitney is an RTX business.

Duncan Aviation has appointed two dedicated project managers to its Engine Overhaul Project Management team, one covering the Honeywell Aerospace TFE731 line and the other the Pratt & Whitney Canada PW300 and PW500 programs.
James Rosenkranz takes the Honeywell TFE731 portfolio. Janet Beazley takes the Pratt & Whitney Canada PW300 and PW500 engines at Duncan Aviation's DOF (Designated Overhaul Facility, a shop authorized by the engine maker to perform factory-level overhauls). The company positions the appointments as a way to give operators more experienced support, consistent communication, and dedicated project oversight through what is typically a shop-visit process measured in weeks and significant six-figure spend per engine.
What does this change for operators?
For a customer, the practical difference is a single named contact who tracks where an engine sits in the overhaul workflow and who can push the project forward when it stalls. Brad Wales, Duncan Aviation's Manager of Engine Overhaul for Honeywell Aerospace, framed the role in exactly those terms.
"Having an experienced Project Manager involved throughout the process gives operators someone who understands where their engine is in the overhaul process and can help keep the project moving," Wales said. "James and Janet each bring extensive experience and a strong understanding of how to coordinate complex maintenance projects."
On the Honeywell side, Rosenkranz's remit covers the bread-and-butter levers of overhaul economics:
- Monitoring project schedules
- Identifying opportunities to control costs
- Ensuring proper documentation
- Coordinating with overhaul teams
- Advocating for the customer throughout the project
Rosenkranz's background is internal and technical. Since joining Duncan Aviation in 2016, he has worked in the Engine Line Shop and the TFE731 Engine Overhaul Shop before moving to the Quality department, where he built experience in inspection and quality processes. That dual exposure to the shop floor and the inspection side is the qualification the company is selling.
"I have experience on both the overhaul and Quality sides, so I understand what it takes to move a project through the process while maintaining a high level of quality," Rosenkranz said.
A 37-year veteran moves to the growing P&WC line
Beazley's appointment carries more weight by tenure. She joined Duncan Aviation in 1988 after serving in the US Air Force as an Automatic Flight Control Specialist, and worked her way up to Assistant Manager. For the last 18 years she has run comprehensive airframe projects as a project manager, experience she now applies to the PW300 and PW500 DOF operation, which Duncan Aviation describes as growing.
"Project management is important because it helps us oversee the technical side of the project while helping the shop remain efficient," Beazley said. "For customers, it gives them a single point of contact for information about their engine and its progress."
Brian Harms, Duncan Aviation's Engine Manager for the Pratt & Whitney Canada DOF, tied the role directly to the visibility question that dominates operator relationships with overhaul shops.
"Customers want to know where their engine is, what's happening next, and what is needed to keep the project moving," Harms said. "Our Project Managers help provide that visibility while coordinating the resources required to complete the work."
Pratt & Whitney is an RTX business.
With business-jet utilization pressuring overhaul slots across the TFE731 and PW300/PW500 fleets, dedicated project management at the MRO level is a capacity signal as much as a service one. How quickly the two appointees translate visibility into measurable turnaround gains will show in Duncan Aviation's shop-visit performance going forward.
via duncanaviation.aero (Original)
More from Sophie Lindqvist
Show full bio
Senior reporter covering people, launches and day-to-day practice in Commercial aviation industry coverage at Flightdeck Report.
707 articles
Same bay
- StandardAero Wins Exclusive PW127M Engine Support Deal With TAROM · October 30, 2026
- Blackhawk Cuts PT6A Overhaul Downtime to Days With Engine Exchange · October 2, 2026
- Lufthansa Group Sends CFM56 Work to FL Technics Kaunas Shop · October 12, 2026
- Aviation MRO Finds an Old Lesson in Henry Ford's Playbook · September 30, 2026
- Western Aircraft names Alfredo Garcia director of MRO sales · October 15, 2026