Clearance CLR-8038 · AIR463
AIRFAA
Airspace & RegulationClearance sheet
FAA deploys 117 tower simulators to accelerate US controller training
The FAA is installing 117 Tower Simulation Systems at US airports, including Montgomery Regional, under its BNATCS modernization. The agency claims the units can cut controller training time by nearly 30%.
Read-back
- FAA installing 117 Tower Simulation Systems nationwide under the Brand New Air Traffic Control System (BNATCS) program
- Montgomery Regional Airport received a TSS in September 2026 as one of the early deployment sites
- FAA claims the TSS can reduce controller training time by almost 30%
- The system projects real airport layouts and supports simulated traffic, weather and emergency scenarios
- BNATCS is positioned as the largest US air traffic modernization effort in a generation

The Federal Aviation Administration will install 117 Tower Simulation Systems (TSS) at airports across the United States, with Montgomery Regional among the first sites to come online as part of the agency's Brand New Air Traffic Control System (BNATCS) initiative. Each unit projects real airport layouts, letting controllers rehearse tower operations against simulated traffic rather than shadowing live positions.
The deployment targets the country's most stubborn operational bottleneck. The FAA has spent years trying to close a controller staffing gap that has left several high- and mid-complexity towers below certified-staff thresholds. Simulation has long been a small part of academy and facility training, but TSS marks the first agency-wide rollout of standardized, high-fidelity tower simulators tied to a specific performance claim: the FAA says the system can cut training time by almost 30%.
What does the system actually do?
A TSS station reproduces the geometry of a working airport — runway headings, taxiway intersections, hold-short lines and ramp areas — and overlays it with synthetic aircraft and vehicles. Trainees work standard tower positions while instructors inject weather, emergencies and irregular traffic to test reaction.
The value, according to the FAA, comes from repetition. Trainees can run a sector reset, a runway change or a full emergency scenario in minutes, without burning live training hours on a quiet shift. For a mid-level facility that might otherwise stage a single complex scenario per day, the simulator offers scale.
Why Montgomery, and why now?
Montgomery Regional (MGM) sits in the FAA's Southern Region and is a typical mid-size tower handling regional jet and general aviation traffic. Local officials framed the installation as a workforce-development tool, not a capacity expansion. The airport itself does not need new runways or new procedures to handle the TSS; it needs controllers faster than the current pipeline can deliver them.
The September 2026 cutover is one of the early visible milestones of BNATCS, a multi-year modernization program that also covers surveillance, surface and communications upgrades. The FAA has framed BNATCS as the largest air traffic overhaul in a generation, and the 117-simulator count is the first concrete rollout number tied to the program.
How much time is 30%?
The FAA did not publish a baseline against which the 30% figure is measured, so the claim needs context. New controller certification at a tower typically runs 12 to 24 months depending on facility complexity and staffing. If a 30% reduction holds across the pipeline, that would pull a 24-month journey toward the 17-month mark — meaningful for an agency that tracks every position on a facility-by-facility basis.
That math, however, assumes simulators substitute for live OJT rather than supplement it. The agency has not said which hours the TSS displaces. If simulated hours only add to the syllabus, training pipelines lengthen rather than shorten, and the 30% saving becomes a throughput gain per trainer rather than per trainee.
What the rollout will not fix
The TSS program does not address the upstream constraints on the controller workforce: the FAA Academy's throughput, the hiring list, medical clearance and the willingness of certified controllers to relocate to hard-to-staff facilities. Simulators can compress on-the-job learning; they cannot mint more academy graduates.
Nor do they change the physical limits of the National Airspace System — runway count, airspace class and weather minima still govern what any tower can handle on a given day.
What to watch next
- The next BNATCS milestones: surveillance, surface and communications procurements remain the larger cost items. The TSS line is small relative to the program total, but it is the first piece the agency can point to as deployed.
- Facility-by-facility certification throughput. The FAA publishes controller-staffing data quarterly; a 2027 cut will show whether the simulator rollout is moving the needle on positions filled versus positions authorized.
- Whether the 30% training-time claim survives independent benchmarking once enough facilities have run a full cohort through the system.
For now, Montgomery Regional has a new training platform, and the FAA has its first tangible BNATCS deliverable to point at. The harder question — whether 117 simulators and a 30% training-time claim add up to a controller workforce that matches demand — will take another two to three years of data to answer.
via waka.com (Original)
More from James Calloway
Show full bio
Staff writer covering industry trends and analytics at Flightdeck Report.
383 articles
Same bay
- FDR333Shenandoah Launches Virginia's First Air Traffic Control Program · September 28, 2026
- FDR207FAA Begins Testing AI Tool for Air Traffic Control · October 10, 2026
- FDR405U.S. to Deploy AI-Powered Tool for Air-Traffic Control · September 30, 2026
- FDR573FAA Rolls Out AI-Powered Tool for Managing Flight Traffic · September 27, 2026
- FDR970FAA Grants Mankato Airport $11.5M for New Control Tower · September 27, 2026