Clearance CLR-1298 · SAF591

SAFTUR

Safety & OperationsClearance sheet

Turkish Cargo 777F remains grounded after Maastricht bird strike

Turkish Cargo Boeing 777F TC-LJL returned to Maastricht after a bird strike during takeoff. The aircraft remained parked 22 hours later while the airline assessed damage.

Read-back

  1. TC-LJL remained parked at Maastricht Airport about 22 hours after landing on 7 November 2026.
  2. Flight TK6040 lasted roughly 25 minutes and included a return after an impact during rotation.
  3. The crew levelled the aircraft at 5,000 feet before landing again on runway 21.
  4. Boeing built TC-LJL with serial 60403 and line number 1532; it joined Turkish Cargo in 2017.
  5. A November 2025 arrival from Miami involved two landing attempts and wake damage to a Beek shed roof.
Turkish Cargo 777F Stranded in Maastricht After Bird Strike
PlateTurkish Cargo 777F Stranded in Maastricht After Bird Strike — Chris Leipelt / unsplash

By Priya Raman

Turkish Airlines’ Boeing 777F freighter TC-LJL remained on the ground at Maastricht Airport in the Netherlands about 22 hours after landing, following a confirmed bird strike during its return on 7 November 2026.

The aircraft was operating Turkish Cargo flight TK6040 to Istanbul on the Saturday night of 7 November. During rotation, the phase immediately after takeoff when the nose rises, the crew heard an impact from an unknown object. Nobody on the flight deck could confirm what the freighter had hit.

TC-LJL departed Maastricht’s runway 21 with no abnormal indication until its nose lifted from the ground. The crew stopped the climb, levelled the aircraft at 5,000 feet and advised air traffic control that they could hear unusual sounds.

Flightradar24 data showed the freighter making a series of wide loops northeast of Maastricht. The pattern gave the pilots time to assess the aircraft, run their checklists and prepare for an early landing.

They lined up for runway 21 again and touched down safely. The complete flight lasted roughly 25 minutes from departure to landing, and the freighter stayed on the ground after the return.

Maastricht Airport confirmed that the freighter had suffered a bird strike. Planespotters listed TC-LJL as parked and noted damage from the strike. The Aviation Herald reported that the aircraft was still grounded about 22 hours after landing.

Bird strikes rank among the most common hazards in commercial aviation, and most occur close to the ground during takeoff or landing. Those phases place aircraft in lower airspace shared with birds.

The available report does not identify where the bird struck or how serious the damage was. Engine ingestion (a bird entering an engine), a dented wing leading edge and a cracked radome (the nose-mounted weather-radar cover) were listed only as possible outcomes. None was confirmed in the public account.

The source identifies no lessor, external maintenance, repair and overhaul (MRO) provider or aviation regulator, and does not report a fleet-wide grounding. It contains no statement from Boeing or General Electric about the incident, so the occurrence cannot support a broader conclusion about 777F reliability or GE90 engine performance.

What does the grounding change for Turkish Cargo?

For now, the grounding removes one 777F from Turkish Cargo’s available fleet while the airline determines the damage and repair scope. Turkish Airlines had to complete a full inspection and any repairs before TC-LJL could fly again.

Neither the cited reports nor the airport statement quantifies repair cost, expected downtime or scheduled-cargo effects. The source provides no return-to-service date, regulatory finding or evidence of wider network disruption. Any larger capacity effect therefore remains unquantified.

The source separates a safe landing from a return to service. The aircraft landed safely; its status then changed from operating to grounded. The report confirms the flight outcome but not the inspection and repair results required before cargo operations resume.

Boeing built TC-LJL at Everett with serial number 60403 and line number 1532. Following a ferry flight to Istanbul between 30 November and 1 December 2017, it joined the Turkish Cargo fleet. The nine-year-old freighter uses two General Electric GE90 engines.

TC-LJL previously operated at Maastricht. In November 2025, AeroHaber reported that wake turbulence, the disturbed air behind an aircraft, stripped hundreds of tiles from a shed roof in nearby Beek. On that occasion, the freighter was arriving from Miami and made two landing attempts.

The 2025 wake event and the 2026 bird strike occurred during different phases of flight, and the source draws no connection between them. Nor does it identify a recurring defect. The new event establishes an inspection and repair obligation, not a conclusion about the aircraft’s long-term reliability.

The next verifiable milestones are completion of the full inspection, a repair estimate and a return-to-service date. Until Turkish Airlines publishes those findings and engineers complete the required work, TC-LJL remains unavailable for cargo operations and the network effect cannot be quantified.

via theaviationhub.co.uk (Source)

Filed under

  • turkish-cargo
  • boeing-777f
  • bird-strike
  • maastricht-airport
  • aircraft-grounding
Share this article:

More from Priya Raman

Priya Raman

Show full bio

Market editor covering money, funding and market shifts around Commercial aviation industry coverage at Flightdeck Report.

627 articles

Same bay

« Previous articleNext article »